The initial phase of work sees a new, two-lane James Walker Trail corridor and bridge connecting Griffin Road at the Arena Road roundabout to Riviera Way in Riversong. The Town anticipates the bridge and the new James Walker Trail will be open to the public by end of 2020.
In addition to the roadway itself, the construction also includes a new separated multi-use pathway and on-road bike lanes that cross the river on the bridge. The new pathway and bike lanes will be connected to the existing pathway and bike lane systems.
The extension of James Walker Trail from Riviera Way through to Highway 22 will be constructed later, depending on the timing of the South Bow development.