Content
Heading 2
Heading 3
Heading 4
Heading 5
Heading 6
Paragraph - Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet.
- List item
- List item
- Indented list item
- List item
- Ordered list item
- Ordered list item
- Indented ordered list item
- Ordered list item
| First cell | Second cell |
|---|---|
| Content | Content |
| Content | Content |
Blockquote example - Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Image and text
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien.


Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.
Accordions
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.
Emphasis
This is the content of the emphasis blockquote
Cards
Card title
Horizontal cards
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec vel finibus quam. Ut diam dui, sodales non nisi nec, viverra tincidunt nisl. Donec non vehicula urna. Nulla dolor augue, molestie ut rhoncus eget, suscipit at felis. Suspendisse et ipsum id odio mattis finibus id nec lectus. Fusce commodo scelerisque arcu a aliquet. Nunc sit amet purus dictum, placerat nisi quis, sodales velit. Nam pulvinar lobortis sapien, ac lacinia enim molestie eleifend. Nullam aliquam consectetur magna in lobortis. Sed quis justo erat. Phasellus rhoncus aliquam nulla. Ut dolor eros, semper ut diam eget, vulputate tincidunt ex.
Horizontal card title
Horizontal image cards
Card title


Images
Quicklinks
For use to link to inside pages within a section, quicklinks should aid with navigation. These links should match the inside menu.
List view
Filming in Cochrane
Final Acceptance Certificate (FAC)
Final Acceptance Certificate - Landscaping (FAC)
Financial Education Workshop Series
Financial resources
Grid view
Description
The Highway 1A improvements Project is a long-awaited upgrade to the Highway 1A corridor through Cochrane from east of Centre Avenue to west of Fifth Avenue.
The project includes:
- widening from two lanes to four lanes from east of Centre Avenue to west of Fifth Avenue
- realignment of Fourth Ave to Fifth Ave
- new access, parking and turning lanes for Sixth Ave W businesses
- improved pedestrian network with a new sidewalk and a paved multi-use pathway
Background
Widening highway 1A has long been a priority for both the Province and Town of Cochrane and is an important piece of Cochrane’s Traffic Plan. This project was approved in the fall of 2020, as Council recognized an opportunity to utilize Provincial grant funding to support these roadway improvements.
This project provides a much-needed improvement to the highway corridor that is experiencing heavy congestion for both local and regional users. The project also includes additional pathways and crosswalks, ensuring a safer experience for vehicles, pedestrians and cyclists.
Location
Highway 1A corridor through Cochrane from east of Centre Avenue to west of Fifth Avenue.
Updates
July 2024: We are thrilled to announce that the paving work on Hwy 1A is officially complete!
We want to extend our heartfelt thanks to all of you for your patience, understanding, and cooperation throughout this project. Your dedication to traffic accommodations made a significant difference. As always, please stay safe while traveling in the area, and let's continue to support each other. Landscaping and warranty work will continue when weather permits.
How will this project benefit the community?
Traffic on the hill and along Highway 1A continues to challenge our community. This work paves the way for streamlined traffic flow along Highway 1A and through the Highway 1A/22 interchange.
Strategic alignment
This project supports Council's strategic priority of community connectivity, and specifically, advocating for Highway 1A improvements within the Town boundaries, including Centre Avenue and 5th Avenue intersections.
Highway 1A improvement project FAQ

Construction began in May 2023 and is anticipated to be completed by spring 2026.
This project includes:
- Expanding Highway 1A from two to four lanes (2 lanes in each direction) from just west of Highway 22 to 6th Avenue (east of Big Hill Creek).
- Two new bridges on Highway 1A over Big Hill Creek
- Replacing the Highway 22 CP Rail overpass over Highway 1A with a new larger overpass structure
- New interchange ramps and roundabouts connecting highways 1A and 22 as part of the interchange
View a rendering of the interchange
Questions?
Email hwy1a22@islengineering.com
Throughout construction, Cochrane Protective Services are engaged in regular project updates with the contractor and Alberta Transportation to ensure that emergency access is maintained for all communities as public safety is a top priority.
Alberta Transportation updates
June 15, 2026
Alberta Transportation and Economic Corridors (ATEC) has provided the following update on construction for the Highway 1A / 22 Interchange project.
ATEC has monitored operations of the new traffic signal at Sunset Blvd for a period of time and can confirm that the traffic signal will be modified. The northbound right turn will no longer be controlled through the traffic signal, but instead will have a small corner island and yield sign, similar to other major intersections in Cochrane and the Calgary region. With this change, drivers must yield to opposing traffic from the southbound left turn when present, but can otherwise proceed at all other times.
Construction update:
- Beginning June 15, crews will start work to convert the northbound Highway 22 to Sunset Boulevard right turn from a signal-controlled turn to a yield-controlled turn.
- Remaining line painting throughout the project site is scheduled to resume the week of June 15.
- Line painting will also include a realignment of the westbound lanes on Sunset Boulevard approaching Highway 22. This change will allow both westbound lanes to feed directly into the dual left-turn lanes, reducing the need for drivers to merge into a single lane before the intersection.
- Most remaining construction activities are expected to be completed within the next three weeks, weather permitting.
- Some landscaping work will continue into July as weather conditions allow.
Localized lane closures, speed reductions and construction access activities will continue for several more weeks. Drivers are asked to drive with caution and obey posted signage.
More info: https://www.cochrane.ca/interchange
Project team: 403.472.4408
Email: hwy1a22@islengineering.com









