Boilerplate

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Quicklinks

For use to link to inside pages within a section, quicklinks should aid with navigation. These links should match the inside menu. 

Accordions

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Content

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Paragraph - Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Default button

Emphasis button

  • List item
  • List item
    • Indented list item
  • List item
  1. Ordered list item
  2. Ordered list item
    1. Indented ordered list item
  3. Ordered list item

Table caption
First cellSecond cell
ContentContent
ContentContent

Blockquote example - Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

The referenced media source is missing and needs to be re-embedded.

Emphasis

This is the content of the emphasis blockquote
Citation

Image and text

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Images

Image caption for the first image

List view

Emergency contacts (Water/Wastewater)

Emergency Information

Emergency Preparedness

Grid view

Address
60 Gleneagles Dr Cochrane, AB T4C 2K8
Amenities
Baseball / softball diamond
Restrooms (seasonal)

Baseball/softball diamond 

Restrooms (seasonal) 

To request a booking, email parks@cochrane.ca or call 403-851-2590. 

Active project
Yes
Schedule
Spring 2025 - Fall 2026
Location
Glenpatrick Drive

 

Description

The Glenpatrick Drive infrastructure replacement project involves the full replacement and improvement of water, sanitary, storm and roadway infrastructure from 5th Avenue to 3-way intersection near Glenbow Elementary School. 

The road will be widened to improve traffic flow and safety, with the road structure upgraded based on the pavement design and traffic impact assessment. New sidewalks and pathways will support active transportation and improve pedestrian connectivity to the school and nearby commercial areas.  

A key upgrade involves transforming the existing three-way intersection near Glenbow Elementary School into a traffic circle, improving the functionality and public safety.


If you have been affected by construction and are parking in the Town’s 5th Avenue lot - or plan to in the future - contact the project team by email or call 403-851-2500 to receive a parking permit and parking instructions.

Updates - October 10

Area 2 – Major work in this area has wrapped up and the road is open!  (West Glenhill Drive and Glenpatrick Road to East Glenhill Drive and Glenpatrick Road)

Current work

  • Landscaping is ongoing, residents please expect short-term closures to sections of parking lanes and sidewalks to facilitate this work. 

Area 3 – Construction is progressing (236 Glenpatrick Drive to 268 Glenpatrick Drive)

Current work

  • Sidewalk construction has begun. 
  • Crews are preparing the ground for new road and sidewalk construction.

Access and closures

  • The road closure remains in effect, as shown on the map below.
  • Walkways in front of the construction area are closed and marked in red on the map.

Temporary water service

  • Temporary water services have been removed and permanent connections to the water main are in place.

Waste, recycling and organics

  • Residents have received a notice with instructions for collection accommodations.

Area 4 - Construction is underway. (5th Ave to Cascade Place)

Current

  • Crews are constructing sidewalks on both sides of Glenpatrick Drive.

Access and closures

  • This section of Glenpatrick Drive will be a one-way road from 5th Avenue to Cascade Place. Please refer to the road closure map for the specific location. 
  • Walkways in front of the construction area are closed and marked in red on the map.

Water service

  • Water services in this area will not be affected.

Waste, recycling and organics

  • Residents have received a notice with instructions for collection accommodations.

Area 5 – Construction is underway  (84 Glenpatrick Road to Glenbrook Cresent) 

Current work 

  • Water main replacement is completed; crews are taking final steps to put it into service.
  • Pathway and road construction will follow the completion of the water main installation in this area.

Access and closures

  • Walkways in front of the construction area are closed and marked in red on the map.
  • Sections of the pathway within William Camden Park have been temporarily closed to accommodate construction activities.
  •  Residents of 73 Glenbrook Crescent (Units 1, 2, and 3) will be unable to access the small parking lot from Glenpatrick Drive during this phase of work. Direct communication will be provided to affected residents with further details.  
  • The intersection of Glenbrook Crescent and Glenpatrick Drive will remain open to vehicle traffic.
  • As schools remain closed, a traffic controller will not be stationed at Glenpatrick Road and Glenbow Drive intersection.

Temporary water service

  • Temporary water services are installed and operational.

Waste, recycling and organics

  • It is anticipated temporary water services will be removed and the water main will be put in service for supply to the affected residents.

Please click for larger images of the road and pedestrian detour maps:

Glenpatrick road closure and detour map

Glenpatrick pedestrian closures map

 

 

glenpatrick map

 

2025 and 2026 project areas 

Project progress photos

Glenpatrick drive progress
Glenpatrick drive progress
Glenpatrick drive progress
Glenpatrick drive area 2
Glenpatrick drive area 2 completed

Background

Council initially approved the project with a set budget for improvements along Glenpatrick Drive and a temporary solution at the three-way intersection. In July 2023, the project was deferred for a year to address audit findings and develop a comprehensive plan. The redesign, completed in 2024, expanded the project’s scope to include a full infrastructure replacement and permanent road enhancements.

How does this project benefit the community?

  • Replaces aging water, storm, and sanitary systems, reducing maintenance and disruptions.
  • Enhances community safety with road upgrades and traffic calming measures.
  • Provides safer walking routes with new pedestrian surfaces.
  • Upgrades stormwater systems to reduce flooding risks.
  • Improves traffic flow to reduce congestion in busy areas.

Strategic Alignment

This project supports Council's commitment to livability, connectivity and vibrant economy and will build on the foundations of financial and environmental stewardship and built environment. This project aligns with the Town's broader planning goals as outlined in the Connecting Cochrane document, supporting community growth and development while ensuring infrastructure is resilient and will serve our community into the future.

Frequently asked questions (FAQs)

Horizontal cards

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec vel finibus quam. Ut diam dui, sodales non nisi nec, viverra tincidunt nisl. Donec non vehicula urna. Nulla dolor augue, molestie ut rhoncus eget, suscipit at felis. Suspendisse et ipsum id odio mattis finibus id nec lectus. Fusce commodo scelerisque arcu a aliquet. Nunc sit amet purus dictum, placerat nisi quis, sodales velit. Nam pulvinar lobortis sapien, ac lacinia enim molestie eleifend. Nullam aliquam consectetur magna in lobortis. Sed quis justo erat. Phasellus rhoncus aliquam nulla. Ut dolor eros, semper ut diam eget, vulputate tincidunt ex.

Horizontal card title

This is the card content

Horizontal image cards

Card title

This is the card content

Another card's title