Boilerplate

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Content

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Paragraph - Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Default button

Emphasis button

  • List item
  • List item
    • Indented list item
  • List item
  1. Ordered list item
  2. Ordered list item
    1. Indented ordered list item
  3. Ordered list item

Table caption
First cellSecond cell
ContentContent
ContentContent

Blockquote example - Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Cochrane logo over yellow background

Image and text

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. 

CommunityClean-up
Fall image of the Bow River through Cochrane

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Accordions

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer laoreet vestibulum mollis. Sed vitae urna sollicitudin, pulvinar diam vel, facilisis libero. Pellentesque at posuere metus, in aliquam mi. Duis neque libero, pulvinar vitae imperdiet a, tempor non sapien. Cras ex felis, tempus non mi at, consequat ultricies velit. Aenean sed ante id ante eleifend tincidunt. Aenean lobortis rutrum semper. Donec rutrum orci vitae ante cursus aliquet. Nullam et odio eu eros congue commodo eget vitae ex. Integer fringilla lacinia tortor, quis gravida ante tristique at. In hac habitasse platea dictumst. Suspendisse nec tortor et turpis pretium viverra. Phasellus ultrices augue eu risus lacinia, et malesuada urna iaculis. Sed viverra urna nulla, a mollis massa tincidunt non. Praesent molestie ex sit amet magna faucibus imperdiet. Ut congue velit justo, sed aliquam dolor aliquam sit amet.

Emphasis

This is the content of the emphasis blockquote
Citation

Horizontal cards

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec vel finibus quam. Ut diam dui, sodales non nisi nec, viverra tincidunt nisl. Donec non vehicula urna. Nulla dolor augue, molestie ut rhoncus eget, suscipit at felis. Suspendisse et ipsum id odio mattis finibus id nec lectus. Fusce commodo scelerisque arcu a aliquet. Nunc sit amet purus dictum, placerat nisi quis, sodales velit. Nam pulvinar lobortis sapien, ac lacinia enim molestie eleifend. Nullam aliquam consectetur magna in lobortis. Sed quis justo erat. Phasellus rhoncus aliquam nulla. Ut dolor eros, semper ut diam eget, vulputate tincidunt ex.

Horizontal card title

This is the card content

Horizontal image cards

Card title

This is the card content
Cochrane Volunteer Fair

Another card's title

Images

outside of protective services building
Image caption for the first image
entry way of the Station

Quicklinks

For use to link to inside pages within a section, quicklinks should aid with navigation. These links should match the inside menu. 

List view

Family Literacy Day Storytime with Seniors Kids Society

Family Resource Network (FRN)

FCSS partners with Calgary Legal Guidance for local legal clinic

Feeding your body for success: The Energy you need to Succeed!

Grid view

Active project
No
Schedule
Complete
Location
Highway 1A corridor through Cochrane from east of Centre Avenue to west of Fifth Avenue.

Description

The Highway 1A improvements Project is a long-awaited upgrade to the Highway 1A corridor through Cochrane from east of Centre Avenue to west of Fifth Avenue.

The project includes: 

  • widening from two lanes to four lanes from east of Centre Avenue to west of Fifth Avenue
  • realignment of Fourth Ave to Fifth Ave
  • new access, parking and turning lanes for Sixth Ave W businesses
  • improved pedestrian network with a new sidewalk and a paved multi-use pathway

Background 

Widening highway 1A has long been a priority for both the Province and Town of Cochrane and is an important piece of Cochrane’s Traffic Plan. This project was approved in the fall of 2020, as Council recognized an opportunity to utilize Provincial grant funding to support these roadway improvements. 

This project provides a much-needed improvement to the highway corridor that is experiencing heavy congestion for both local and regional users. The project also includes additional pathways and crosswalks, ensuring a safer experience for vehicles, pedestrians and cyclists. 

Location 

Highway 1A corridor through Cochrane from east of Centre Avenue to west of Fifth Avenue.

Updates

  • July 2024: We are thrilled to announce that the paving work on Hwy 1A is officially complete!

    We want to extend our heartfelt thanks to all of you for your patience, understanding, and cooperation throughout this project. Your dedication to traffic accommodations made a significant difference. As always, please stay safe while traveling in the area, and let's continue to support each other. Landscaping and warranty work will continue when weather permits. 

How will this project benefit the community?

Traffic on the hill and along Highway 1A continues to challenge our community. This work paves the way for streamlined traffic flow along Highway 1A and through the Highway 1A/22 interchange. 

Strategic alignment

This project supports Council's strategic priority of community connectivity, and specifically, advocating for Highway 1A improvements within the Town boundaries, including Centre Avenue and 5th Avenue intersections.

Highway 1A improvement project FAQ

Aerial photo of HWY 1A looking south west, Cochrane, Alberta
Progress updated August 2024
Active project
Yes
Schedule
Spring 2023 - Spring 2026
Location
Highway 1A/22 Intersection

2024 project board

Construction began in May 2023 and is anticipated to be completed by spring 2026. 

This project includes: 

  • Expanding Highway 1A from two to four lanes (2 lanes in each direction) from just west of Highway 22 to 6th Avenue (east of Big Hill Creek).
  • Two new bridges on Highway 1A over Big Hill Creek 
  • Replacing the Highway 22 CP Rail overpass over Highway 1A with a new larger overpass structure
  • New interchange ramps and roundabouts connecting highways 1A and 22 as part of the interchange

Project website

View a rendering of the interchange

Questions?

 Email hwy1a22@islengineering.com

Throughout construction, Cochrane Protective Services are engaged in regular project updates with the contractor and Alberta Transportation to ensure that emergency access is maintained for all communities as public safety is a top priority.

Alberta Transportation updates

February 27, 2026: Interchange update: Sunset intersection

Alberta Transportation and Economic Corridors has provided the following update:

Temporary traffic changes are coming to the Hwy 22 & Sunset Blvd intersection next week, as crews install new traffic lights.

 March 2–4, 2026 (9 a.m. – 3 p.m.)

  • Southbound right lane closures through the intersection
  • Westbound dual left-turn lane reduced to one lane
  • Expect minor delays during daytime hours

March 5, 2026 (9 a.m. – 3 p.m.) – Expect delays with flagger-controlled intersection

  • Traffic lights will be turned off
  • The intersection will be controlled by flaggers
  • Lane closures will be in place in all directions

Speed limit will be reduced to 30km/hr during construction. 

March 5 will see the most disruption as crews switch over to the new traffic light system. 

Remember to plan ahead, allow extra travel time and follow all posted signage and directions from crews to help keep everyone safe.*Please be advised that project times can change due to weather.

More info: https://www.cochrane.ca/projects-plans-development/capital-projects/hig…

Project team: 403.472.4408

Email: hwy1a22@islengineering.com

 

January 15, 2026: Interchange update – Pedestrian tunnel opening

Alberta Transportation has shared that the pedestrian tunnel under Highway 22 opened on January 16, 2026. The tunnel includes interior lighting to improve visibility and safety for users.

Line painting is being touched up in various places, remaining permanent line painting will take place in the spring. Speed limits are also being adjusted, with the remaining 30 km/h sections being removed. Please continue to drive with care and follow posted signage.

Image
illustrated map of HWY 1A/22 interchange highlighting construction updates, including open and future pathways

 

North facing view of the intersection of HWY 1A and HWY 22 prior to construction project starting in 2023.
North facing view of the intersection of HWY 1A and HWY 22 prior to construction project starting in 2023.
North facing view of the intersection of HWY 1A and HWY 22 as of Fall 2025, construction project nearing completion.
North facing view of the intersection of HWY 1A and HWY 22 as of Fall 2025, construction project nearing completion.
Cars on highway road travelling south on HWY 22 in Cochrane, AB.
South facing view of the intersection of HWY 1A and HWY 22 prior to construction project starting in 2023.
Two roundabouts at highway 1A and highway 22 intersection, south east facing view
South-east facing view of the intersection of HWY 1A and HWY 22 as of Fall 2025, construction project nearing completion.